TURNAGAIN STREET SEWER UPGRADE, Anchorage, AK
Client: Anchorage Water & Wastewater Utility
Project Summary:
Installed, by sliplining, approximately 3,182 lf of 41-inch reinforced pipe into an existing 48-inch sewer transmission main interceptor pipe. Excavated and backfilled insertion pits, approximately 1,250 sy of asphalt removal and replacement, sewer flow control, approximately 3,182 lf of pre and post CCTV inspections, installed approximately 3,182 lf of annular space grout, connected side sewers and sewer connections, sewer manhole cleaning, traffic control, all related appurtenances, and restored the affected streets and improvements.